The project, carried out at Jones Brothers Civil Engineering UK, in Ruthin, North Wales, was carried out by Gilks’ Mechanical Team between February and July 2020.
We were required to decommission the existing wet heating system and replace it with a new VRF Air Conditioning System for the office areas and electric panel heaters in the toilet and circulation areas.
A purpose made condenser compound was formed to the east elevation of the building with the VRF services running through the existing ceiling voids to serve ceiling mounted cassettes in various locations throughout.