Date: 08 Oct 2021

Muller Shrink Wrap Facility

Our brief was to design, supply and install the electrical services to the new Shrink Wrap facility.

Project: C2071 Muller Shrink wrap facility

Client: Hollingsworth Ellery Ltd, (Muller Milk and Ingredients Ltd)
Project Manager: Paul Coogan
Location: Muller, Manchester ,M17 1TU
Duration: 12 Weeks; completed September 2018

The project incorporated the following Electrical services within the scheme:

  • Identification /Isolation/Removal of redundant services.
  • General Power 400v, 230v, 110v
  • LV Distribution
  • Led Lighting
  • Emergency Lighting
  • Fire Alarm System
  • Auto door supplies
  • Ventilation supplies
  • Conveyor Supplies
  • Containment
  • Testing and commissioning

Related Case Studies

7th Oct, 2021
Lytham St Annes Care Home – The Hamptons

Our brief was to design, supply and install the electrical services to the new development, utilising the latest in...

Read more
Ashgate AMbulance Station
15th Oct, 2021
Ashgate Ambulance Station

The project involved the refurbishment of the ambulance station by Seddon Property Services

Read more
7th Oct, 2021
Crewe Engineering Supplies – Oil Van Fit Out

Crewe Engineering Supplies have a contract to install Oil Tanks and pumps into new Vauxhall Movano vans.

Read more