Date: 08 Oct 2021

Muller Shrink Wrap Facility

Our brief was to design, supply and install the electrical services to the new Shrink Wrap facility.

Project: C2071 Muller Shrink wrap facility

Client: Hollingsworth Ellery Ltd, (Muller Milk and Ingredients Ltd)
Project Manager: Paul Coogan
Location: Muller, Manchester ,M17 1TU
Duration: 12 Weeks; completed September 2018

The project incorporated the following Electrical services within the scheme:

  • Identification /Isolation/Removal of redundant services.
  • General Power 400v, 230v, 110v
  • LV Distribution
  • Led Lighting
  • Emergency Lighting
  • Fire Alarm System
  • Auto door supplies
  • Ventilation supplies
  • Conveyor Supplies
  • Containment
  • Testing and commissioning

Related Case Studies

15th Oct, 2021
VRF Air Conditioning Installation

The project, carried out at Jones Brothers Civil Engineering UK, in Ruthin, North Wales, was carried out by Gilks’...

Read more
Job Centre Plus boiler house replacement works 
5th Sep, 2021
Job Centre Plus Boiler room modifications

The project involved replacement of boiler plant, pumps, dosing pots, flues and air dirt separators with upgrades to the...

Read more
7th Oct, 2021
Crewe Engineering Supplies – Oil Van Fit Out

Crewe Engineering Supplies have a contract to install Oil Tanks and pumps into new Vauxhall Movano vans.

Read more