Job Centre Plus boiler house replacement works
The project was carried out by Gilks mechanical team between November 2020 & March 2021
The project involved replacement of boiler plant, pumps, dosing pots, flues and air dirt separators with upgrades to the existing gas system and BMS control panels in seven job centres throughout the east & west midlands.
The job centres were occupied during the works and temporary heating to the buildings was installed to prevent disruption to the daily operation of the offices.
On completion all plant was tested & commissioned , thermally insulated and the existing systems were chemically flushed and inhibitor added.
The project was carried out by Gilks mechanical team between November 2020 & March 2021
The project involved replacement of boiler plant, pumps, dosing pots, flues and air dirt separators with upgrades to the existing gas system and BMS control panels in seven job centres throughout the east & west midlands.
The job centres were occupied during the works and temporary heating to the buildings was installed to prevent disruption to the daily operation of the offices.
On completion all plant was tested & commissioned , thermally insulated and the existing systems were chemically flushed and inhibitor added.