Date: 07 Oct 2021

Crewe Engineering Supplies – Oil Van Fit Out

Crewe Engineering Supplies have a contract to install Oil Tanks and pumps into new Vauxhall Movano vans. We have worked alongside Crewe Engineering to install control equipment and associated cabling to enable the servicing and maintenance of High Voltage equipment by the Company.

Project: Oil Van Fit Out

Client: Crewe Engineering Supplies
Project Manager: Kevin Francis
Location: Crewe

 

Two oil storage tanks are installed into the vehicles, one to carry clean oil and the second tank allowing the transportation of the waste oil, 4 no. pumps serve these tanks enabling the engineers to remove the waste oil and recharge with the new oil.

A consumer unit has been installed within the rear of the vehicles, which in turn supplies plugs and sockets, enabling the framework carrying the pumps and hoses to be disconnected and removed if required.

 

 

Related Case Studies

Job Centre Plus boiler house replacement works 
5th Sep, 2021
Job Centre Plus Boiler room modifications

The project involved replacement of boiler plant, pumps, dosing pots, flues and air dirt separators with upgrades to the...

Read more
8th Oct, 2021
Telford Court Care Facility, Crewe

Read more
8th Oct, 2021
Muller Shrink Wrap Facility

Read more